QUALITY & STATISTICS
Quality & SPC Tools
Rank the risks, prove stability, and price poor quality before it prices you — beginning with an FMEA template Excel workbook made to be used, not shelved.
Core Quality Concepts Behind These Tools
The workbooks on this page cover the standard toolkit of quality engineering. Four ideas sit underneath almost all of them — understand these, and you can pick the right tool for any problem in minutes.
Control limits are not specification limits
The most expensive misunderstanding in quality is confusing the voice of the process with the voice of the customer. Specification limits come from the design or the customer: a dimension must fall between them, or the part fails. Control limits come from the process itself, calculated from its own variation on a control chart — conventionally set at three standard deviations from the process mean. A process can be perfectly in control and still make scrap if it is not capable; and a process that meets specification today can be drifting out of control toward tomorrow's failures. The SPC charts on this page watch control; capability work compares the two.
Prevention beats detection
Inspection sorts good from bad after the cost of making the bad ones is already spent. FMEA works the other way: list how a process could fail, score each failure mode for severity, occurrence, and detection, and spend your effort where the combined risk is highest — ideally redesigning the step so the failure cannot happen, or cannot escape if it does. The Control Plan then locks in what gets checked, how often, and what to do when a check fails, so the prevention survives shift changes and staff turnover. The FMEA and Control Plan workbooks on this page are built as a pair for exactly that sequence: analyze the risks first, then standardize the checks that keep them controlled.
Match the analysis to the question
- “Where should we focus first?” — a Pareto chart: rank defect types or causes by frequency or cost, and work the vital few.
- “Is the process stable?” — a control chart, watched over time.
- “Does this input actually move the output?” — regression analysis, which separates real relationships from coincidence.
- “What is poor quality costing us?” — the COPQ tracker: scrap, rework, returns, and expediting added up in money.
A first Pareto, step by step
- Pick one process and one week of defect records.
- Group the defects into categories — and use the same category names every time.
- Count each category and sort the bars from largest to smallest.
- Work the tallest bar first; it usually holds more improvement than the bottom five combined.
- Re-chart after the fix. If the tallest bar did not shrink, the fix treated a symptom.
Who this is for
For quality engineers, quality managers, and process engineers: rank risks before they become escapes, prove process stability with real control charts, and put a dollar figure on poor quality so the next improvement project funds itself. Methods follow the standard references, credited inside each workbook. Household, classroom, and business use terms are on the Etsy listing.